Archive > Server r8 Hard Goal (50 Milion Goal)

Server 14 (Gameplay in images)

(1/1)

alex879ro:
Designed as a Hard Goal, it remained that way...

The game length is rather short , starting 1970 and ending in 2010. The loan(200.000 EUR) is smaller then the one for other servers . The maximum number of trains allowed is 100 and the same goes for road vehicles.

But the hard points of the server are without doubt  the map which is made out of mountainous islands and the maximum train length: 7 tiles (1 locomotive +13 wagons)

A good strategy is to find a very good place to start (2 industries of the same kind or one with big production) and also to build as cheap as you can. Spendings have to be watched all the time in this server:)

Beside this, every new strategy is welcomed:)

Images:

alex879ro:
More images:

alex879ro:
And even more images: (Thanks to Andreas[Beul] for the screenshots)

Navigation

[0] Message Index

Go to full version